Earthing Solutions upgraded the earthing system for Sydney Trains Boronia Tunnels #1 and #2 Project in Cowan.
The work involved:
- Upgrading the earthing system on the high voltage overhead poles
- Installing electrodes for the new padmount substation
- Supplying and installing 4 x 4.8m, 2 x 5.3m, 2 x 6m, 1 x 13m, 2 x 20m, 2 x 28.2m and 2 x 30m electrodes