The project involved:
- Supply and installation of 2 x 20m electrodes
- Excavation and installation of earth grid and connection of electrodes
- Installation of electrode pits and clamps
- Testing
Challenge:
Due to the location and the schedule, the project required critical coordination with the client. The plant and equipment for the project, including the drill rig, compressor and excavator, had to be transported by barge across the Hawkesbury River to the site.
Result:
The Earthing Solutions team successfully completed the project on time and without incident.