Supply and installation of multiple high voltage and low voltage electrodes and earth grid. The project involved drilling to install the electrodes, preparing the electrode inspection pits, excavating and back filling trenches, exothermic welding for electrode connection, and 3 pole FOB testing.
Challenge: With the project being within the rail corridor, Earthing Solutions had to undertake all excavation works with an excavator fitted with a slew limiter to ensure safety on site.
Result: The project was safely executed on time and on budget.
Project Details
Client : Sydney Trains
Type : Kiosk Transformer Earth Grid
Date : September 2020
Scope of project:

Drilling electrodes with compact GEO 105

Preparing trenches prior to back-fill

Excavating trenches in the rail corridor

Excavating trenches for earth grid

Exothermic welding

Exothermic welding for electrode connection

Exothermic weld for electrode connection

Preparing the electrode inspection pit

Electrode inspection pits

3 pole FOP test earth resistance reading